Projects
![Royal Vaasen producent in verpakkingsmateriaal](https://www.cervitech.nl/wp-content/uploads/2024/07/2023-03-20-768x512.jpg)
Royal Vaasen
Vanuit Royal Vaasen, een producent van verpakkingsmateriaal in Vaassen, is CERVITECH gevraagd om een nieuwe naverbrander te plaatsen. CERVITECH zal de oude RTO (naverbrander) vervangen
![](https://www.cervitech.nl/wp-content/uploads/2024/04/IMG_8245-1-768x576.jpg)
Berry Global UK
In Worcester, there's a production facility for Berry Global. CERVITECH BV may carry out a new project here in collaboration with RELOX GMBH.
![](https://www.cervitech.nl/wp-content/uploads/2024/02/IMG_6924-768x576.jpg)
Koninklijke Drukkerij EM De Jong
Koninklijke Drukkerij EM De Jong recently completed a second-hand RTO from Belgium! This is to replace the current afterburning installation, which is no longer effective.
![](https://www.cervitech.nl/wp-content/uploads/2024/02/RTO-768x576.jpg)
CERVITECH/RELOX RTO at Ammeraal Beltech BV
CERVITECH was asked to place a new RTO by Ammeraal Beltech BV.
![](https://www.cervitech.nl/wp-content/uploads/2023/12/20231128_110247-3-768x576.jpg)
CERVITECH/RELOX RTO at Berry Global Hardenberg
Voor Berry Global mocht CERVITECH een nieuwe RTO plaatsen om tot de huidige eisen van emissie te voldoen.
![](https://www.cervitech.nl/wp-content/uploads/2023/07/Nieuwe-lijn-768x432.jpg)
Getting new filter cloth production line ready
We were asked by Filtrair bv in Heerenveen whether we urgently had a temporary project engineer available
![](https://www.cervitech.nl/wp-content/uploads/2023/04/foto-machine-veilighied-1-768x346.jpg)
Van Der Meulen
Research: Does our machinery meet the current machinery directive?
![](https://www.cervitech.nl/wp-content/uploads/2023/03/Picture-1-768x577.jpg)
Royal Vaasen
Optimization & renovation of existing afterburner
![](https://www.cervitech.nl/wp-content/uploads/2023/03/image001.jpg)
Cogas Media
Cogas Media
![](https://www.cervitech.nl/wp-content/uploads/2022/05/20220713-2465-768x512.jpg)
Packaging Industry Veenendaal (VIV)
Gas-free printing facility realized by supplying an afterburner.
![](https://www.cervitech.nl/wp-content/uploads/2022/07/IMG_4122-768x576.jpg)
RTO at Muraplast in Croatia
A succesfull commissioning project of a 30.000Nm3/h RTO of Relox at Muraplast in Croatia
![](https://www.cervitech.nl/wp-content/uploads/2022/04/IMG_6379-768x579.jpg)
Flexpak-Oerlemans
Delivery afterburner
![](https://www.cervitech.nl/wp-content/uploads/2022/07/IMG_7794-768x576.jpg)
Graphic Packaging International
Realization of new production location
![](https://www.cervitech.nl/wp-content/uploads/2022/07/IMG_6736-768x576.jpg)
Stempher-Oerlemans Rijssen
Realization of new printing company
![](https://www.cervitech.nl/wp-content/uploads/2022/07/image002.jpg)
FTTH Allinq Noord Nederland
Project management