Projects

WZ packaging
Energiebesparingsproject en service

Plast-ferb
RTO installation

Amcor UK
RTO installation and connection, installation of new parts washing machine

FENZI
Turnkey project. Delivery of RTO, connection, startup, roof fan, and maintenance.

Reflex Group, Telford UK
Turnkey project. Removal of old RTO, installation and connection of new RTO

Amcor Hardenberg
New RTO, measurements, connection with printing press

Royal Vaasen
At Royal Vaasen, producer of packaging material, an important change was planned. In order to increase production capacity and meet the latest emission requirements,

Stempher-Oerlemans Rijssen
Cervitech assisted Stempher with the purchase of a flexo printing press and the delivery of the complete printing facility.

FTTH Allinq Noord Nederland
Jan Boes of Cervitech leads the FTTH project at Allinq and coordinates the entire fiber optic connection.

Grafoprint Roemenië
The afterburner installation went smoothly and is now complete. Thanks to the expert approach of the Cervitech team, the system is operating smoothly and meeting Grafoprint's technical and operational expectations.

Suikerunie
A completely new residential area will be built on the former Suikerunie site in the province of Groningen over the next ten years. With no fewer than 3,000 homes, spread over a

AFB Oss
AFB Oss, een toonaangevend producent van ingrediënten voor dierenvoeding, heeft de afgelopen periode belangrijke stappen gezet om de betrouwbaarheid en efficiëntie van haar installaties te

Horn & Bauer
At Horn & Bauer, specialist in protection and packaging solutions, a major modernization was planned. In order to make production more efficient and sustainable,

Fardem Packaging
Fardem, een producent van industriële verpakkingen voor diverse B2B-markten zoals voedsel, chemie, en diervoeders, heeft recent een nieuwbouwproject gerealiseerd, waarbij onder de nieuwbouw twee kelders

CERVITECH/RELOX RTO at Ammeraal Beltech BV
CERVITECH was asked to place a new RTO by Ammeraal Beltech BV.

Packaging Industry Veenendaal (VIV)
Gas-free printing facility realized by supplying an afterburner.

Koninklijke Drukkerij EM De Jong
Koninklijke Drukkerij EM De Jong recently completed a second-hand RTO from Belgium! This is to replace the current afterburning installation, which is no longer effective.

Getting new filter cloth production line ready
We were asked by Filtrair bv in Heerenveen whether we urgently had a temporary project engineer available

Van Der Meulen
Research: Does our machinery meet the current machinery directive?

Flexpak-Oerlemans
Delivery afterburner