
The partnership between Cervitech and Reflex Group is continuing with the supply of two new RTO systems. Both systems are destined for Reflex Group production sites in the United Kingdom and are scheduled for delivery in 2027.
Cervitech and Reflex Group have long collaborated on reliable, future-proof solutions for treating process emissions. Cervitech previously assisted Reflex with issues involving existing afterburners and conducted comprehensive inspections of the technical condition and reliability of these installations.
For the Telford location, the previously discussed second-hand RTO is being replaced by a new RTO from Cervitech. With this move, Reflex Group is opting for a new, future-proof system. Initially, the possibility of installing a second-hand RTO was considered; however, Reflex Group has since decided to invest in a brand-new RTO from Cervitech.
A major development is also planned for Worcester. Reflex Group is building a new factory there, for which Cervitech will supply a new RTO. The system is being tailored to the new production site's future production and emission control requirements.
These two projects further expand the collaboration between Cervitech and Reflex Group. Cervitech is proud of the trust placed in it by Reflex Group and looks forward to the completion of both projects in 2027.